Bỏ qua để đến Nội dung
Menu
Câu hỏi này đã bị gắn cờ

Lead times can be set at routes->rules and control points at operations.

How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?

Ảnh đại diện
Huỷ bỏ
Tác giả Câu trả lời hay nhất

- Create "Quality Control" Locations based on quality control approval times
- Create routes with rules for products/Product Categories that must go to these locations
- Create a Control point type instructions for the operation that moves the products to these locations, at which time samples are taken
- In the rule that moves the product from QC locations to "stock", add a Lead Time as the approval times
- Add a Control point of type pass/fail in the operation that moves the products from the QC locations to the stock

Ảnh đại diện
Huỷ bỏ
Bài viết liên quan Trả lời Lượt xem Hoạt động
0
thg 1 24
1972
3
thg 12 22
4867
0
thg 6 22
1691
0
thg 4 18
3299
2
thg 9 25
2606