Skip to Content
Meniu
Trebuie să fiți înregistrat pentru a interacționa cu comunitatea.
Această întrebare a fost marcată

Lead times can be set at routes->rules and control points at operations.

How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?

Imagine profil
Abandonează
Autor Cel mai bun răspuns

- Create "Quality Control" Locations based on quality control approval times
- Create routes with rules for products/Product Categories that must go to these locations
- Create a Control point type instructions for the operation that moves the products to these locations, at which time samples are taken
- In the rule that moves the product from QC locations to "stock", add a Lead Time as the approval times
- Add a Control point of type pass/fail in the operation that moves the products from the QC locations to the stock

Imagine profil
Abandonează
Related Posts Răspunsuri Vizualizări Activitate
0
ian. 24
1972
3
dec. 22
4867
0
iun. 22
1691
0
apr. 18
3299
2
sept. 25
2606