Lead times can be set at routes->rules and control points at operations.
How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
Lead times can be set at routes->rules and control points at operations.
How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?
- Create "Quality Control" Locations based on quality control approval times
- Create routes with rules for products/Product Categories that must go to these locations
- Create a Control point type instructions for the operation that moves the products to these locations, at which time samples are taken
- In the rule that moves the product from QC locations to "stock", add a Lead Time as the
approval times
- Add a Control point of type pass/fail in the operation that moves the products from the QC locations to the stock
Crea un account oggi per scoprire funzionalità esclusive ed entrare a far parte della nostra fantastica community!
RegistratiPost correlati | Risposte | Visualizzazioni | Attività | |
---|---|---|---|---|
|
0
gen 24
|
1973 | ||
|
3
dic 22
|
4871 | ||
|
0
giu 22
|
1700 | ||
|
0
apr 18
|
3308 | ||
|
2
set 25
|
2609 |