Lead times can be set at routes->rules and control points at operations.
How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
Lead times can be set at routes->rules and control points at operations.
How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?
- Create "Quality Control" Locations based on quality control approval times
- Create routes with rules for products/Product Categories that must go to these locations
- Create a Control point type instructions for the operation that moves the products to these locations, at which time samples are taken
- In the rule that moves the product from QC locations to "stock", add a Lead Time as the
approval times
- Add a Control point of type pass/fail in the operation that moves the products from the QC locations to the stock
相關帖文 | 回覆 | 瀏覽次數 | 活動 | |
---|---|---|---|---|
|
0
1月 24
|
1972 | ||
|
3
12月 22
|
4867 | ||
|
0
6月 22
|
1691 | ||
|
0
4月 18
|
3299 | ||
|
2
9月 25
|
2606 |