Lead times can be set at routes->rules and control points at operations.
How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
Lead times can be set at routes->rules and control points at operations.
How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?
- Create "Quality Control" Locations based on quality control approval times
- Create routes with rules for products/Product Categories that must go to these locations
- Create a Control point type instructions for the operation that moves the products to these locations, at which time samples are taken
- In the rule that moves the product from QC locations to "stock", add a Lead Time as the
approval times
- Add a Control point of type pass/fail in the operation that moves the products from the QC locations to the stock
Maak vandaag nog een account aan om te profiteren van exclusieve functies en deel uit te maken van onze geweldige community!
AanmeldenGerelateerde posts | Antwoorden | Weergaven | Activiteit | |
---|---|---|---|---|
|
0
jan. 24
|
1972 | ||
|
3
dec. 22
|
4867 | ||
|
0
jun. 22
|
1690 | ||
|
0
apr. 18
|
3298 | ||
|
2
sep. 25
|
2606 |