Pular para o conteúdo
Menu
Esta pergunta foi sinalizada
1 Responder
3983 Visualizações

Lead times can be set at routes->rules and control points at operations.

How can I configure a quality control where I have to wait a certain period of time for the result before the next triggered move?

Avatar
Cancelar
Autor Melhor resposta

- Create "Quality Control" Locations based on quality control approval times
- Create routes with rules for products/Product Categories that must go to these locations
- Create a Control point type instructions for the operation that moves the products to these locations, at which time samples are taken
- In the rule that moves the product from QC locations to "stock", add a Lead Time as the approval times
- Add a Control point of type pass/fail in the operation that moves the products from the QC locations to the stock

Avatar
Cancelar
Publicações relacionadas Respostas Visualizações Atividade
0
jan. 24
1983
3
dez. 22
4891
0
jun. 22
1718
0
abr. 18
3325
2
set. 25
2615