Bỏ qua để đến Nội dung
Menu
Câu hỏi này đã bị gắn cờ

Hey, 



I was wondering, is it possible to setup automatic flush of components that are linked to a specific operation? i.e. if operation A is linked to component X and Y, I wish when posting output in operation A to automatically consume components X and Y based on BOM quantities. This is key in our activities as some low-valued items (like labels etc.) should be flushed like that and it is very cumbersome to enter quantity for operator manually.


Thanks.

Ảnh đại diện
Huỷ bỏ
Bài viết liên quan Trả lời Lượt xem Hoạt động
3
thg 12 24
5838
1
thg 5 22
5441
1
thg 2 18
3177
1
thg 8 25
933
Multi layered BOMs Đã xử lý
2
thg 8 25
721