Skip to Content
Menu
Dette spørgsmål er blevet anmeldt

Hey, 



I was wondering, is it possible to setup automatic flush of components that are linked to a specific operation? i.e. if operation A is linked to component X and Y, I wish when posting output in operation A to automatically consume components X and Y based on BOM quantities. This is key in our activities as some low-valued items (like labels etc.) should be flushed like that and it is very cumbersome to enter quantity for operator manually.


Thanks.

Avatar
Kassér
Related Posts Besvarelser Visninger Aktivitet
3
dec. 24
6547
1
maj 22
5787
1
feb. 18
3444
1
okt. 25
448
1
aug. 25
1261