Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda

Hey, 



I was wondering, is it possible to setup automatic flush of components that are linked to a specific operation? i.e. if operation A is linked to component X and Y, I wish when posting output in operation A to automatically consume components X and Y based on BOM quantities. This is key in our activities as some low-valued items (like labels etc.) should be flushed like that and it is very cumbersome to enter quantity for operator manually.


Thanks.

Avatar
Buang
Post Terkait Replies Tampilan Aktivitas
3
Des 24
5897
1
Mei 22
5461
1
Feb 18
3183
1
Agu 25
963
2
Agu 25
753