跳至內容
選單
此問題已被標幟

Hey, 



I was wondering, is it possible to setup automatic flush of components that are linked to a specific operation? i.e. if operation A is linked to component X and Y, I wish when posting output in operation A to automatically consume components X and Y based on BOM quantities. This is key in our activities as some low-valued items (like labels etc.) should be flushed like that and it is very cumbersome to enter quantity for operator manually.


Thanks.

頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
3
12月 24
5794
1
5月 22
5426
1
2月 18
3175
1
8月 25
917
2
8月 25
666