Bỏ qua để đến Nội dung
Menu
Câu hỏi này đã bị gắn cờ
1 Trả lời
333 Lượt xem

Hello , i am using multilevel boms for manufacturing furniture . Each furniture is made by several pieces with several kits that connect and make my final piece of furniture , so the question is. Why when i make a manufacture order and i don’t have enough materials ,for example wood pieces for the drawer kit and metal pieces for the metal base ,i get notified i don’t have enough components but the production from the needed materials doesn’t start. I mean that , cant the odoo send a notification to have the needed materials produced? Because inside the kit of the drawer the is a bom about how the wooden parts need to be proceeded and prepared .So what happens when i dont have enough materials from my final product? Have i have to always check manually and manually produce the components missing from my furniture bom or there is an automated way so when i create a PO ,if needed ,the production of the materials is going to start ? I hope my description is not confusing enough . 

 

Ảnh đại diện
Huỷ bỏ
Câu trả lời hay nhất

Yes, if replenishment rules are defined and set to ‘Auto’ an MO for unavailable components would be generated.

Inventory > Operations > Replenishment menu to define product specific rules

Ảnh đại diện
Huỷ bỏ
Bài viết liên quan Trả lời Lượt xem Hoạt động
0
thg 7 25
356
1
thg 5 25
835
0
thg 3 25
973
0
thg 3 25
894
1
thg 3 25
2400