Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie
1 Odpowiedz
534 Widoki

Hello , i am using multilevel boms for manufacturing furniture . Each furniture is made by several pieces with several kits that connect and make my final piece of furniture , so the question is. Why when i make a manufacture order and i don’t have enough materials ,for example wood pieces for the drawer kit and metal pieces for the metal base ,i get notified i don’t have enough components but the production from the needed materials doesn’t start. I mean that , cant the odoo send a notification to have the needed materials produced? Because inside the kit of the drawer the is a bom about how the wooden parts need to be proceeded and prepared .So what happens when i dont have enough materials from my final product? Have i have to always check manually and manually produce the components missing from my furniture bom or there is an automated way so when i create a PO ,if needed ,the production of the materials is going to start ? I hope my description is not confusing enough . 

 

Awatar
Odrzuć
Najlepsza odpowiedź

Yes, if replenishment rules are defined and set to ‘Auto’ an MO for unavailable components would be generated.

Inventory > Operations > Replenishment menu to define product specific rules

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
0
sie 25
5
0
lip 25
577
1
maj 25
1008
0
mar 25
1105
0
mar 25
1071