Bỏ qua để đến Nội dung
Menu
Câu hỏi này đã bị gắn cờ
5421 Lượt xem

For a project we often make a pre calculation of all needed materials and hours. The calculation mostly results in totals per group (Total hours per function type and total materials per location).

Based on this calculation we make the quotation to the customer. The quotation only consist the totals and not the underlying calculation details. After we get the order of the project, we want to use the quotation as base reference.

We invoice bases on fixed price. Mostly in percentages of the whole quotation (this can be done in standard OpenERP)

So we want to see the pre calculation of the project, compared with the real costs on the project. The comparison is viewed on totals, but we must be able to zoom in on the details.

Can someone advise how I can set this up, or if I need custom development for this. Or maybe some custom modules are already there?

Ảnh đại diện
Huỷ bỏ

I do not think that this is really possible in OpenERP - For sure there are contracts (created for every project) and you could link a couple of quotations to a single contract which in fact may be some "work around" for your issue - when you finish the project you could compare all the initial quotations with the invoices to have a comparison of what was planed and what was really billed.

Bài viết liên quan Trả lời Lượt xem Hoạt động
0
thg 11 21
1301
3
thg 11 21
4713
1
thg 3 15
4577
0
thg 3 15
4136
0
thg 3 15
5740