Hi,

I'm using Odoo 18, and I want to calculate the costs and time based on employees available on a work center.

For example, a work center capacity is 10 employees, but 2 of them are absent today so the capacity today is 8 employees, how should I manage that, so Odoo calculates the correct time and costs today.

I only see the capacity as total of employees, or should I change the capacity of a work center each day? Is it a good practice?

Ảnh đại diện
Huỷ bỏ
Câu trả lời hay nhất

I was wondering the same, maybe we reach the same conclusion, that we can't?

Regards.