Bỏ qua để đến Nội dung
Menu
Câu hỏi này đã bị gắn cờ
1 Trả lời
8067 Lượt xem

I have a product BoM structured (as shown in 'Product BoM Structure' menu item) like this:

  • Main product
    • Component 1
  • * * Subcomponent 1
    • Component 3
    • Component 4
    • Component 5
    • Component 6
    • Component 7
  • * * Subcomponent 2
  • * * * Subsubcomponent 2
    • Component 10
    • Component 11

When a manufacturing order is issued for Main product the stock won't get cascaded for deduction, and only the top level products are picked. As a result the Subsubcomponent 2 stock will remain as nothing has happened.

Is this the correct behavior? What can be wrong here?

Ảnh đại diện
Huỷ bỏ
Câu trả lời hay nhất

Hello Vinicius,

I believe this is the expected behavior indeed: with normal Bill Of Materials, each Bill Of Material is assembled in a new production order. So to produce your top level product, the "level 1" components will be required in some production order.

Then the scheduler will eventually create draft purchase orders or draft production orders to produce the components required in this production order at "level 1". Of course, you also need to properly define what will happen with the level 2 components: are them taken from stock? produced? bought?

Now, you can have OpenERP require all components at once no matter the depth if you use a special kind of Bill Of Material, the "phantom BOM". You can read more about phatom BOM's here: doc.openerp.com/7.0/book/5/5_15_Manufacturing/5_15_Master_data/#phantom-bills-of-materials

Hope this helps

Ảnh đại diện
Huỷ bỏ
Bài viết liên quan Trả lời Lượt xem Hoạt động
1
thg 11 21
13327
0
thg 3 15
4800
4
thg 8 15
10254
Multi layered BOMs Đã xử lý
2
thg 8 25
726
2
thg 8 24
4305