Hi,
in production you have : Raw Materials Location
And
in Routing : poduction Location
* if the location is different => it generates me a transfer:
From Raw Materials Location to poduction Location.
my question : how can I configure this transfer, taking considering quantity in poduction Location.
thank for your answers.
,