İçereği Atla
Menü
Bu soru işaretlendi
3756 Görünümler

Hi,

in production you have : Raw Materials Location

And

in Routing : poduction Location

* if the location is different => it generates me a transfer:

     From Raw Materials Location to poduction Location.

my question : how can I configure this transfer, taking considering quantity in poduction Location.


thank  for your answers.

,

 

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Oca 25
1298
1
Tem 23
6109
0
Haz 21
4031
0
Şub 19
4714
4
Nis 25
7823