Odoo 14, CE
I have a BoM attached to a product that is subcontracted. I have the subcontractor service cost on the purchase tab of the product. That cost is not automatically included when I press the "Compute cost from BoM" link.
The documentation describes the cost as being A + B + s = C. The subcontractor cost is "s". I have that on the purchase tab. It is supposed to be added to the components we supply which are "A". Those are what I have on the BoM.
Do I have to also add a product to the BoM that represents the subcontractor cost?