Hi!
We've faced an issue:
Raw materials is kept in uncutted sheets (3000mm*2000mm).
We have orders for numerous products with unique (individual) scale.
External system gets MOs and stocks of uncutted big sheets and then allocate orders to big sheets.
As a result we have 2-3-4 unique cutting maps (many products on one sheet).
Then we need to close couple of MOs by cutting 1 sheet of raw material. Smth like UNKIT.
Is it possible to create ONE Manufacturing oder for a couple of products?
or....
Is it possible to group MOs by their belonging to one cutting map and run the whole group of MOs, that will take 1 sheet of raw material on stock, and produce whole group of individual products? Several products should be produced on one workcenter simultaneously....
Have anyone faced this issue before?
Thank You!
Anton Kisleyko
skype: kisly2005