Hello everyone, I have a problem with Manufacturing Orders
There is only 1 work order from the Sales, but the Manufacturing Orders has a MO number According to the list of products that ordered
But my work flow : example
"Product about : figure model"
Products : Man standing / Woman sitting / Child sleeping
Option : blonde hair, blue shirt / black hair, red shirt / orange hair, White shirt
Production process: 1. 3D printing / 2. Trimming / 3. Assembling / 4. Coloring / 5. Coating
There is a Sales order
- Woman sitting / blonde hair, blue shirts 10 Units
- Woman sitting / black hair, red shirts 10 Units
- Woman sitting / orange hair, White shirts 10 Units
3D printed 30 pieces all at the same process.
Trim figure 30 pieces all at the same process.
Assemble 30 pieces all at the same process.
And coated 30 pieces all at the same process.
Just separate 10 Units / 10 Units / 10 Units when painting
Being like this makes repetition in planning, What should I do to make my work able to plan effectively, would like to consult and find a solution here.
thank you...