Is there a way I can make BOM dependent on ther boms. In my case I first need to have high voltage wires ready before I can install the battery pack, PDU and inverters onto a car.
I do not want to add all of the components to a single bom since the components can be installed separately, and I want to keep it flexible for planning.
I also dont want to add the HV-wiring BOM to the other boms to avoid needing to manufacture 3 HV-wiring BOMs.
Small flow chart of what I am trying to achieve:
|Battery Pack |
|HV-Wiring| --->|PDU | ---> |Drive Train|
|Inverter |
Thanks in advance!
(Working in Odoo V18)