Skip to Content
Menu
This question has been flagged

Hello,

V15

My end product is made out of a BOM. I want to trace raw materials with lot numbers. Ever since enabling Lot/Serial numbers, I need to manually consume all raw materials.


This was done automatically before upon Validation, the system would just look at "To Consume" and assume this was the same as "Consumed".

But now it prompts the error message "You must indicate a non-zero amount consumed for at least one of your components". If I consume one component and Validate, it will still warn me that I didn't consume the other components.

How do I (re-)enable automatic consumption based on "To Consume" (BOM)?


Thanks in advance!

Avatar
Discard

Hello @ Berend Simons.
Did you find anyway to enable this automatic consumption?

I noticed a flag in V16 for Manufacturing operation "Consume Reserved Lots/Serial Numbers automatically?". So upgrade might be necessary.

Related Posts Replies Views Activity
2
Jul 25
363
2
Aug 24
4164
1
Mar 24
1918
2
Jun 21
3126
0
Mar 21
1896