تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
3825 أدوات العرض

Hello,

V15

My end product is made out of a BOM. I want to trace raw materials with lot numbers. Ever since enabling Lot/Serial numbers, I need to manually consume all raw materials.


This was done automatically before upon Validation, the system would just look at "To Consume" and assume this was the same as "Consumed".

But now it prompts the error message "You must indicate a non-zero amount consumed for at least one of your components". If I consume one component and Validate, it will still warn me that I didn't consume the other components.

How do I (re-)enable automatic consumption based on "To Consume" (BOM)?


Thanks in advance!

الصورة الرمزية
إهمال

Hello @ Berend Simons.
Did you find anyway to enable this automatic consumption?

I noticed a flag in V16 for Manufacturing operation "Consume Reserved Lots/Serial Numbers automatically?". So upgrade might be necessary.

المنشورات ذات الصلة الردود أدوات العرض النشاط
Multi layered BOMs تم الحل
2
أغسطس 25
771
2
أغسطس 24
4330
1
مارس 24
2052
2
يونيو 21
3286
0
مارس 21
2024