Please let me know is there a way to trigger the right BOM with different variants. I donot want to create a different BOM for different variant.
Solution required: I have implemented Multilevel BOM. But during manufacturing order, the BOM should automatically select the right BOM.
I know I can use property option and schedule. But if there are different variants at different point of assemblies/BOM? How to handle it?
Thank you in advance.