跳至內容
選單
此問題已被標幟
2647 瀏覽次數

Please let me know is there a way to trigger the right BOM with different variants. I donot want to create a different BOM for different variant. 

Solution required: I have implemented Multilevel BOM. But during manufacturing order, the BOM should automatically select the right BOM.

I know I can use property option and schedule. But if there are different variants at different point of assemblies/BOM? How to handle it?

Thank you in advance.


頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
2
1月 20
2865
6
10月 18
5925
2
12月 24
8644
1
5月 24
1638
3
9月 23
6449