I currently have set MTO for a raw material, and reordering rules with min and max.
When I create MPS for the product and replenish it, I get draft POs that fulfill the quantity required by the MOs.
However, POs created are associated with an individual MO and they end up ordering 20 kg extra.
WH/MO/00041 requires 75 kgs, but 20 kg is left from a previous order (WH/MO/00040) and is reserved for WH/MO/00041 which leaves out -55 kg.
But rather than ordering just 55kg for WH/MO/00041, it orders the whole 75 kgs quantity leaving me with 20kg extra.
Is there any way I can order exactly what is needed?
Can you please specify min and max values for that raw material? Thank you.
Min : 50 and Max : 200