Hello,
When I make a manufacturing order i would like my components material to be send to a specific location, meaning removed from stock and go to a production wharehouse.

the goal being to be able to check a stock list of all the components (raw material) I have at that location at any given time.

I have created such a location but i am not sure how to make so that my components are transfer to that location while the MO is ongoing. of course once the MO is finished this materials do not exist any more and the final product goes to stock that is OK,

Thanks in advance for your precious help
Regards

Victor 



Avatar
Discard

Hi,
Did you try creating a pull rule to create an automatic transfer to move materials from stock to production location so that when you create a MO, this transfer is also triggered.

Best Answer

You could enable the 2 step manufacturing, this would create the pull rule WH/Stock to WH/Pre-production using 'Pick Components' operation type. You can change the default pre-production location to the location you want

Inventory > Configuration > Warehouse and select the warehouse



On validating the pick components operations the components for an MO would be transferred to the pre-production location

Avatar
Discard
Best Answer

https://www.odoo.com/documentation/15.0/applications/inventory_and_mrp/inventory/routes/concepts/use-routes.html

The description in the documentation is about pick / pack / Quality check etc.  But the pricinple for picking to manufacturing order would bes the same.