If the creation of lots/SN is deactivated in the subcontracting and receipt operations, the system allows me to receive "subcontracted" products without insert a lot/SN.
Its also possible to add these lots/SN in a subsequent operation where a control point is configured (for example in the transfer for Quality to Stock location).
The problem is that when analyzing the consumption, it is not possible to register the components consumption.
even worse, by unarchiving and opening the "subcontracting" operation, the system allows to add a lot/SN and only a new is accepted.
Thanks!
Did you find a solution? I am looking for a similar solution to insert SN only for approved products in an operation after manufacturing, but Odoo requires the insertion of the LOT in the manugacturing operation.