Hi,

I have plenty stock of each material listed in my BOM (all storable products), but whenever I create a Manufacturing Order and check it for availability, the MRP doesn't reserve any material and the status of Material Availability is "Waiting". If I have the purchase module installed, it creates a Request for Quotation for all the products listed on the BOM, even though I have plenty of stock already, and the only way to keep going with the production without buying more materials is by forcing the production and deleting the RFQ, but obviously the idea is that the MRP reserves the existing stock whenever I check for availability, and create a RFQ just in cases when there are not enough stock of some products listed in the BOM.

I just have just 1 warehouse and 1 location in my company. How can I solve that?

Avatar
Discard
Best Answer

Hi,

Could you, please, tell me what is the configuration of your product? Especially the inventory tab of your product form.


Kr

Avatar
Discard
Best Answer

Dear David 

did you got solution to your problem 

I also got stuck with sub assembly product stock on hand is not considering the MO for c item

Avatar
Discard
Author Best Answer

I've tried with two different configurations.
Supposing that I have a Product C which is comprised by Product A plus Product B.

In other words. A+B->C

The BOM type is: Manufacture this product.
BoM: 1 Unit of A + 1 Unit of B = 1 Unit of C

The idea is that the process be as follows:
1. I have 10 units of Product A, 10 units of Product B and 10 units of Product C already in stock
2. I make a Sales Order for 30 Units of Product C
3. The system will check the stock of product C, therefore the system will reserve the 10 unit I already have in stock, and the other 20 units will be executed by a Manufacture Order (MO).
4. The manufacture (MO) order will check the availability of Products A and B, reserving the 10 units of Product A and Product B that I already have in stock, and then will make a RFQ to my vendor for the remaining 10 units of product A and 10 units of Product B. It would be even better if I could execute the MO for those 10 units initially reserved while I wait for my vendor to bring me the remaining products.
5. One the purchased of the remaining units of Product A and Product B is completed, those will be processed by the Manufacture order to create the last 10 units of product C.
6. Process the delivery to my client. It will be even better if I can choose delivering my product C as they are being manufactured (for example 3 batch of 10 units of Product C).

These are the two configurations that I tried.

Configuration Nº1: Using the route Replenish on order (MTO)
Item A: Storable; Can be Purchased (with vendor setted); Routes: Buy + Replenish on Order (MTO)
Item B: Storable; Can be Purchased (with vendor setted); Routes: Buy + Replenish on Order (MTO)
Item C: Storable ; Can be Sold; Routes: Manufacture (BoM setted) + Replenish on Order (MTO)

Then I understood that Replenish on order (MTO) route will buy (or manufacture) the quantities ordered in Sales Order regardless of each product's stock. Therefore, this option is not suitable to my case.

Configuration Nº2: Using reordering rules
Item A: Storable; Can be Purchased (with vendor setted); Routes: Buy
Item B: Storable; Can be Purchased (with vendor setted); Routes: Buy
Item C: Storable ; Can be Sold; Routes: Manufacture (BoM setted)

Reordering Rules:
Product A: Minimum 5 (I even tried with 0) and Maximum 10
Product B: Minimum 5 (I even tried with 0) and Maximum 10
Product C: Minimum 5 (I even tried with 0) and Maximum 10

This configuration seems more logic to me. But when I execute the sales order, the system just reserve the 10 units of Product C that I have on stock and it do no more actions (neither the Manufacture order nor the Requests for Quotations) no matter how many times I run the scheduler.

I believe that the problem is that the reordering rule of product C don't trigger the Manufacture Order, because I even tried to run the scheduler with a reordering rule Min 15 and Max 20 por product C, having 10 units on stock, and when I ran the scheduler nothing happened again. And I can confirm it's not a BoM problem because if I create a Manufacturing Order of product C manually, the rest of the process (Request for Quotations and Manufacturing) work very well.

Thanks in advance for your help!

Avatar
Discard

Hi,

Could you, please, open a ticket on www.odoo.com/help ?

Because I (and a product owner) tried your configuration on runbot and everything worked well.

So, maybe that the problem comes from somewhere else.

Kind Regards,