Does somebody know why during Manufacturing there are 2 internal moves for the raw material : 1- From stock location to stock location 2- From stock location to production location It seems that move #1 unnecessary and when we want to cancel a MO we have to first cancel move#1 and after move#2 and after the MO. Is there a setting to change that ?