コンテンツへスキップ
メニュー
この質問にフラグが付けられました

Hello,

I have a bill of Material consisting of 2 operations, in 2 different work locations.


I would like either:
- To Assign 2 different repsonsiblesto the 2 Work Orders inside the Manufacturing Order automatically, with an automated rule
- To Assign 1 responssible of the Manufacturing Order that is then updated when the 1st Work Order is complete.

I tried the 1st option but I only managed to assign responsible for the first WO inside the WO.


Could you help me?


Thanks,

アバター
破棄
関連投稿 返信 ビュー 活動
2
9月 23
6061
1
10月 21
4004
2
12月 24
1642
0
2月 24
1091
0
7月 23
1667