Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda

Hello,

I have a bill of Material consisting of 2 operations, in 2 different work locations.


I would like either:
- To Assign 2 different repsonsiblesto the 2 Work Orders inside the Manufacturing Order automatically, with an automated rule
- To Assign 1 responssible of the Manufacturing Order that is then updated when the 1st Work Order is complete.

I tried the 1st option but I only managed to assign responsible for the first WO inside the WO.


Could you help me?


Thanks,

Avatar
Buang
Post Terkait Replies Tampilan Aktivitas
2
Sep 23
6216
1
Okt 21
4167
2
Des 24
1741
0
Feb 24
1216
0
Jul 23
1841