Similar to Manufacturing Orders, is there a way to adjust the Quantity produced in the Work Order?
Example:
- Creating 50x Item A
- Item A contains 3 operational steps which spawns 3 Work Orders. One for each sub-assembly.
- Initiating 1st work order, but I only managed to get through 20 sub-assemblies out of 50 before my shift end.
- The operational steps are locked in a sequence. Meaning you can't start 2nd WO before you've finished the 1st WO.
With Manufacturing Orders, I can go in and manually put in 20 of 50. How do I enable such feature for Work Orders?