I have designed a kanban view in a new model to basing in the state. In the statusbar the order is correct (draft, confirmed, done and cancel) but in the kanban view the order of columns is (cancel, confirmed, done and draft).

¿As I can change?

 

Thanks

アバター
破棄
著作者

Thanks, I'll try your solution.

最善の回答
please check following https://stackoverflow.com/a/65899071/19632058


アバター
破棄
最善の回答

Juani,

You have to make sure these stages are linked with a sequence field.

Please follow crm.lead or  project.task methodology.