跳至內容
選單
此問題已被標幟
2 回覆
9071 瀏覽次數

I have designed a kanban view in a new model to basing in the state. In the statusbar the order is correct (draft, confirmed, done and cancel) but in the kanban view the order of columns is (cancel, confirmed, done and draft).

¿As I can change?

 

Thanks

頭像
捨棄
作者

Thanks, I'll try your solution.

最佳答案
please check following https://stackoverflow.com/a/65899071/19632058


頭像
捨棄
最佳答案

Juani,

You have to make sure these stages are linked with a sequence field.

Please follow crm.lead or  project.task methodology.

Thanks.

頭像
捨棄