Zum Inhalt springen
Menü
Sie müssen registriert sein, um mit der Community zu interagieren.
Diese Frage wurde gekennzeichnet
2 Antworten
1138 Ansichten

If i have an item like a laptop and unbuild the parts into several locations.

Laptop - 1 pc taken from WH/Stock/X1

Parts:

Keyboard - 1 pc store to WH/Stock/A1

Motherboard 1 pc store to WH/Stock/A2

etc.


I need the user to be able to specify where to store the parts.

Avatar
Verwerfen
Beste Antwort

If you would always store to the same location, you could define putaway rules.

If you wish to create an inventory operation each time, a possible way could be to create a new location and have a push rule trigger an internal transfer operation. This location can be selected as the destination location while creating the unbuild order.

Avatar
Verwerfen
Autor

How about getting from different locations? Letting Odoo recommend the location to source from.

Yes, the source as well as destination can be provided for a unbuild order.

If this option isn’t available, you would need to enable storage locations option from settings > inventory > warehouse section

Beste Antwort

Hi,


By default, Odoo’s Unbuild Order sends all recovered components to a single stock location, and it doesn’t allow choosing different destinations for each part. If you need to store components like a keyboard, motherboard, and battery in separate locations, you have two main options: either unbuild into one location and then manually transfer parts using Internal Transfers, or create a customization where the Unbuild Order form lets users assign a destination location for each component. The second option is cleaner if you frequently disassemble items and want full control over where each part is stored.


For more information, refer to the following,


* https://www.cybrosys.com/odoo/odoo-books/odoo-book-v16/manufacturing/unbuild-orders/

* https://www.youtube.com/watch?v=ssKG1E50z6Q

* https://www.youtube.com/watch?v=GvzVKID1Wro

* https://www.odoo.com/documentation/18.0/applications/inventory_and_mrp/manufacturing/workflows/unbuild_orders.html#:~:text=A%20new%20unbuild%20order%20can,bill%20of%20materials%20(BoM).


Hope it helps

Avatar
Verwerfen
Verknüpfte Beiträge Antworten Ansichten Aktivität
0
Jan. 23
1816
2
Sept. 25
109
4
Sept. 25
230
3
Sept. 25
257
3
Sept. 25
380