Overslaan naar inhoud
Menu
Je moet geregistreerd zijn om te kunnen communiceren met de community.
Deze vraag is gerapporteerd
3 Antwoorden
1004 Weergaven

I have a shop where I obtain the product already manufactured,  I do a quality control and then then sell it. Now I would like to create the master BOM of the products and create its different variants that they have. I've made the BOM manually on paper and it has 5 levels, so subassemblies will be needed. 

I also do repairs here and assembly some sets if the client bought the EXTRA SET of the product, so i have an stock of components in case they are needed for repairs or those EXTRA SETS.

Whenever I sell the product it should not take out components from stock because they have not been used. But whenever I do a repair I should need to take that component out of the stock. 


So, how do I accomplish that ? What kind of BOM should I use ? Should I use different types of BOM for each subassemblies ?




I would like to create the BOM of my product and its different variants. 

Avatar
Annuleer
Beste antwoord

1. Do set your receipt to be 2 steps, to enable quality check of bought products.

2. Not certain the need for BOMs as the manufactured products are being bought. BOMs can be created from product page or from Manufacturing app. Since there are subassemblies they would require to be defined as products and then associated boms.

Variants can included in a single BOM (by utilizing apply on variants field on BOM lines) or a separate BOM can be created for each variant.

3. Ensure the routes that are applied to manufactured products is ‘buy’ so the reordering rule doesn’t create a manufacturing order.

4. Would recommend the use of repairs app which has would consume or increment the components used or changed.

In this business flow don’t seem to see the use of BOMs any more than just documentation.

Hope this address your question 

Avatar
Annuleer
Auteur Beste antwoord

By creating more than one warehouse. You mean to create a warehouse for selling products and one for the spare parts used for repairs, right ?

Avatar
Annuleer

Yes, then you can define the routes and rule.

Beste antwoord

To address the scenario please create separate warehouses, by  utilizing Odoo's routes and rules you can achieve the functionality.

 

Avatar
Annuleer
Gerelateerde posts Antwoorden Weergaven Activiteit
1
mrt. 23
4099
4
jun. 25
2069
1
jun. 25
913
0
feb. 25
910
1
nov. 24
1796