Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie
3 Odpowiedzi
1001 Widoki

I have a shop where I obtain the product already manufactured,  I do a quality control and then then sell it. Now I would like to create the master BOM of the products and create its different variants that they have. I've made the BOM manually on paper and it has 5 levels, so subassemblies will be needed. 

I also do repairs here and assembly some sets if the client bought the EXTRA SET of the product, so i have an stock of components in case they are needed for repairs or those EXTRA SETS.

Whenever I sell the product it should not take out components from stock because they have not been used. But whenever I do a repair I should need to take that component out of the stock. 


So, how do I accomplish that ? What kind of BOM should I use ? Should I use different types of BOM for each subassemblies ?




I would like to create the BOM of my product and its different variants. 

Awatar
Odrzuć
Najlepsza odpowiedź

1. Do set your receipt to be 2 steps, to enable quality check of bought products.

2. Not certain the need for BOMs as the manufactured products are being bought. BOMs can be created from product page or from Manufacturing app. Since there are subassemblies they would require to be defined as products and then associated boms.

Variants can included in a single BOM (by utilizing apply on variants field on BOM lines) or a separate BOM can be created for each variant.

3. Ensure the routes that are applied to manufactured products is ‘buy’ so the reordering rule doesn’t create a manufacturing order.

4. Would recommend the use of repairs app which has would consume or increment the components used or changed.

In this business flow don’t seem to see the use of BOMs any more than just documentation.

Hope this address your question 

Awatar
Odrzuć
Autor Najlepsza odpowiedź

By creating more than one warehouse. You mean to create a warehouse for selling products and one for the spare parts used for repairs, right ?

Awatar
Odrzuć

Yes, then you can define the routes and rule.

Najlepsza odpowiedź

To address the scenario please create separate warehouses, by  utilizing Odoo's routes and rules you can achieve the functionality.

 

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
1
mar 23
4090
4
cze 25
2052
1
cze 25
899
0
lut 25
908
1
lis 24
1785