Passa al contenuto
Menu
La domanda è stata contrassegnata
948 Visualizzazioni

I need the ability to change the result of Work operations inside a Manufacturing order.


eg product d -> makes C -> makes B + A.

B then makes another product.


i want to be able to set out the whole operation inside a manufacturing order instead of having multiple MO for one product. 

Is this possible? is there an application that already does this?

Avatar
Abbandona
Post correlati Risposte Visualizzazioni Attività
0
feb 24
6
0
lug 23
1396
0
mag 23
1250
1
mar 25
1619
2
feb 25
2446