I need the ability to change the result of Work operations inside a Manufacturing order.
eg product d -> makes C -> makes B + A.
B then makes another product.
i want to be able to set out the whole operation inside a manufacturing order instead of having multiple MO for one product.
Is this possible? is there an application that already does this?