Přejít na obsah
Menu
This question has been flagged

I need the ability to change the result of Work operations inside a Manufacturing order.


eg product d -> makes C -> makes B + A.

B then makes another product.


i want to be able to set out the whole operation inside a manufacturing order instead of having multiple MO for one product. 

Is this possible? is there an application that already does this?

Avatar
Zrušit
Related Posts Odpovědi Zobrazení Aktivita
0
úno 24
6
0
čvc 23
1374
0
kvě 23
1229
1
bře 25
1480
2
úno 25
2359