Hi,

How do I change the quantity of items to consume on the production order ?

For example I have an article 1 X  = 4 a + 10 b
To make Article 10 of X there must be consumed 40 a + 100 b is the parameter level nomenclature of Article X
But the actual production of gold Article X I need to consume 50 a + 100 b to produce 10 X

 

頭像
捨棄
最佳答案

You verify Bill of Materials and value Manufacturing Efficiency, this value, for you, should be 1.0.

頭像
捨棄
作者 最佳答案

Thank you for your reply

But for our case I do not have the same data for all production orders.

It means that sometimes I used 50 a has produced 10 article X, sometimes +, sometimes -

For each production, I do not know in advance the exact quantities required.

頭像
捨棄