Перейти к содержимому
Меню
Чтобы взаимодействовать с сообществом, необходимо зарегистрироваться.
Этот вопрос был отмечен
2 Ответы
5292 Представления

I'm trying to achieve a scheduled action that will execute the following.


SCHEDULED ACTIONS

Requirement: Change record in Internal Reference field on Partner model for the following 3 scenarios:


SCHEDULED ACTION 1

IF 365 spend = £5000 +, REMOVE EXISTING THEN INSERT [A]; AND IF 365 spend more than previous period THEN INSERT [1] OR IF 365 spend less than previous period THEN INSERT [2]; AND IF less than 365 days since first order THEN INSERT [N]


SCHEDULED ACTION 2

IF 365 spend = £500-£4999.99, REMOVE EXISTING THEN INSERT [B]; AND IF 365 spend more than previous period THEN INSERT [1] OR IF 365 spend less than previous period THEN INSERT [2]; AND IF less than 365 days since first order THEN INSERT [N]


SCHEDULED ACTION 3

IF 365 spend = below £500, REMOVE EXISTING THEN INSERT [C]; AND IF 365 spend more than previous period THEN INSERT [1] OR IF 365 spend less than previous period THEN INSERT [2]; AND IF less than 365 days since first order THEN INSERT [N]



SOME EXAMPLES

Internal ref = A1N - means its top spender, newly partnered with us

Internal ref = B2 - means its a good spender but declining

Internal ref = C1 - means its a low spender but growing.



KEY

A - top spender

B - good spender

C - low spender


1 - growth

2 - decline


365 Spend = Commercial Entity sum untaxed total of invoices or confirmed sales orders in year (which ever is easier to measure)

Аватар
Отменить
Лучший ответ

This is a good example. Thanks

Аватар
Отменить
Лучший ответ

hi, to to look here, quite good examples. 

https://odootricks.tips/about/building-blocks/server-actions/


Аватар
Отменить
Related Posts Ответы Просмотры Активность
0
мар. 25
1336
4
апр. 24
174196
0
дек. 23
2120
1
окт. 23
8380
5
июл. 25
227894