In our previous MRP system, we had a flag that could be set on a BoM to specify that only 1 of an item should be included for an entire manufacturing order. For example, you only need one assembly instruction manual to go along with a kit of parts to make a hundred finished items. I don't see any way to do this in OpenERP, so the system is trying to consume 100 manuals for a manufacturing order for 100 items. The manuals should actually be non-inventoried stock, and not reflected in the QoH counts. How can I set up something like this behavior?
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
- CRM
- e-Commerce
- Boekhouding
- Voorraad
- PoS
- Project
- MRP
Deze vraag is gerapporteerd
Can you include the assembly instruction manual at a higher level in the BOM structure? For example:
Change BOM from this:
- Parent Assembly A
- Widget 1: qty=1
- assembly instruction manual: qty=1
To this:
- Parent Assembly B
- assembly instruction manual: qty=1
- Parent Assembly A
- Widget 1: qty=100
Then, rather than making an order for 100 of Parent Assembly A, you would create an order for 1 of Parent Assembly B.
Depending on the different quantities you would want to produce, you may need to have several different parent assemblies. For example, this:
- Parent Assembly C
- assembly instruction manual: qty=1
- Parent Assembly D
- Widget 1: qty=200
Or, this:
- Parent Assembly E
- assembly instruction manual: qty=1
- Parent Assembly F
- Widget 1: qty=50
Geniet je van het gesprek? Blijf niet alleen lezen, doe ook mee!
Maak vandaag nog een account aan om te profiteren van exclusieve functies en deel uit te maken van onze geweldige community!
AanmeldenGerelateerde posts | Antwoorden | Weergaven | Activiteit | |
---|---|---|---|---|
|
1
aug. 25
|
2390 | ||
|
0
jan. 23
|
2165 | ||
|
7
jan. 23
|
18351 | ||
|
1
mrt. 15
|
4781 | ||
|
3
jun. 24
|
1720 |