how to place the item in specific location after completing its each manufacturing process.

I has multiple manufacturing operations and workcenters. 

I need to store the item to specific location which gets completion from production  and also i consume that item for another production for this i want to pick item from previous location and store the item in another location after completion of production. 

like this i need to do nearly four time seperate. so please help me out. 

Avatar
Annuleer
Beste antwoord

The solution should be to set up Routes and rules accordign to your needs. I never done it myself, but take a look at this video to get going.

https://www.youtube.com/watch?v=cm2QYjILbyc

Avatar
Annuleer
Auteur

Thanks for the response