You might have noticed that, even if your product has multiple bills of material, when you work with MTO, the manufacturing order generated at the confirmation of your sales order is automatically in Confirmed status, leaving you no option or flexibility to change the bill of material, or other features.
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
- CRM
- e-Commerce
- Contabilità
- Magazzino
- PoS
- Project
- MRP
La domanda è stata contrassegnata
Standard behaviour in Odoo:
In order to have flexibility, the workaround is to create a new bill of material, leaving it blank and putting it at the top of the sequence.
In this way, at confirmation of the sales order, the manufacturing order will be generated in Draft status, as the bill of material is blank, leaving you the option to select the bill of material desired.
Seems like this might work for replenishment rules as well?
I can confirm this works in v17 - thanks
I've tried this solution and it partially work. Unfortunately, upon creating the MO from MTO trigger, we cannot save the bill of material. Therefore, each production is using the BLANK BoM while the components differs from one MO to another.
Are there any solutions so we can choose the BoM flexibly?
Ti stai godendo la conversazione? Non leggere soltanto, partecipa anche tu!
Crea un account oggi per scoprire funzionalità esclusive ed entrare a far parte della nostra fantastica community!
RegistratiPost correlati | Risposte | Visualizzazioni | Attività | |
---|---|---|---|---|
|
1
mag 22
|
119 | ||
MTO through multiple BOMs - 13.0
Risolto
|
|
1
mag 21
|
3583 | |
|
2
apr 25
|
20259 | ||
MTO for Components in BOM
Risolto
|
|
2
nov 23
|
1461 | |
|
1
giu 25
|
5859 |
Awesome, it works! Many thanks