Skip ke Konten
Menu
Pertanyaan ini telah diberikan tanda
3776 Tampilan

I struggling this case, i have a product bill of material and manufacturing order, after 2 months i want to revised this bill of material and save some changes here. at the same time I add 2 more product for this product(BOM), if i selecting manufacturing order means case 2 will come, case 1 is not working how? any other methods are there for Multi BOM.

Regards Sridharan G

Avatar
Buang
Post Terkait Replies Tampilan Aktivitas
2
Jul 25
448
2
Agu 24
4210
1
Mar 24
1942
2
Jun 21
3165
0
Mar 21
1917