İçereği Atla
Menü
Bu soru işaretlendi
3823 Görünümler

I struggling this case, i have a product bill of material and manufacturing order, after 2 months i want to revised this bill of material and save some changes here. at the same time I add 2 more product for this product(BOM), if i selecting manufacturing order means case 2 will come, case 1 is not working how? any other methods are there for Multi BOM.

Regards Sridharan G

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
2
Ağu 25
669
2
Ağu 24
4288
1
Mar 24
2008
2
Haz 21
3247
0
Mar 21
1993