跳至内容
菜单
此问题已终结
4087 查看

I struggling this case, i have a product bill of material and manufacturing order, after 2 months i want to revised this bill of material and save some changes here. at the same time I add 2 more product for this product(BOM), if i selecting manufacturing order means case 2 will come, case 1 is not working how? any other methods are there for Multi BOM.

Regards Sridharan G

形象
丢弃
相关帖文 回复 查看 活动
1
10月 25
443
2
8月 25
1156
2
8月 24
4803
1
3月 24
2357
2
6月 21
3595