​I have 4 internal Locations 

Like :- Wh1 , Wh2 , PL1 , PL2 

Operational Type having Raw material Location as PL1 and Finished Location as WH1

While creating and producing  an MO with that operational type, sometimes raw materiel is consumed from WH1 other than PL1

Tried to recreate this issue in development side but not used to show this every time.

Is this a common behavior? is there anyone else affecting this issue? 